Title: A New Lower Bound for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
Authors: Bianco, Lucio
Caramia, Massimiliano
Keywords: generalized precedence relationships
lower bound
project scheduling
Issue Date: 7-Jul-2009
Series/Report no.: Research Report
RR-06.09
Abstract: In this paper we propose a new lower bound for the resource constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better practical performance of the proposed method with respect to the those present in the literature
URI: http://hdl.handle.net/2108/914
Appears in Collections:Research reports (Enterprise Engineering)

Files in This Item:

File Description SizeFormat
RR_06_09.pdf394KbAdobe PDFView/Open

Show full item record

All items in DSpace are protected by copyright, with all rights reserved.